Menexus
Compare designs against the work they must do
When a team has several ways to solve a design problem, the hard part is knowing which differences matter. This planned capability would let your engineers compare alternatives against the loads, operating conditions, costs and tolerances relevant to the decision.
For example, a manufacturer could explore how changes to a component affect its expected strength and material use. The team would compare the model’s predictions with its existing estimate and choose the next test. Results would show the assumptions and uncertainty, so a promising simulation can be challenged before anyone commits to a build.
How we measure it
Compare hours from the approved design brief to a documented test decision with the current process. Count setup and rework. Record which candidate designs were compared against the agreed constraints.
What Agentz would automate
Agentz would turn the engineering brief into a comparison of candidate designs, constraints and assumptions. It would propose the test that could resolve the uncertainty most likely to change the decision.
The R&D engineer sets the criteria and chooses what to test.
These capabilities are in development. Get in touch to discuss a workflow your organisation would like to test.